Research Article

An ARMA Type Fuzzy Time Series Forecasting Method Based on Particle Swarm Optimization

Table 9

The obtained results (last 7 observations are test set) for ISBEMI Set 3.

DateThe test data[2][4][5] distribution-based method[5] average-based method[11][32]The proposed method

23.12.20095116251137521505190051573510335131751684
24.12.20095146151137508505070050373510335131751109
25.12.20095166151137508505070051240510335131751684
28.12.20095161951137521505190051573510335131751684
29.12.20095178651137521505190051573510335131751684
30.12.20095166851137521505190051773520045131751684
31.12.20095282551137521505190051573510335131751684

RMSE771.0155666.5039659.9450671.4803830.4429640.4131494.5180
MAPE 0.01160.01230.01110.00970.01280.00900.0061
DA0.33330.33330.33330.33330.16670.50000.6667