Research Article
System Simulation and Implementation of SIPS in Taiwan
Table 4
Action table for area transfers and triggering actions.
(a) |
| ID: C4 A37 | 1-step 1-load shedding | 2-step 2-load shedding and shunt trip actions | Central-to-n orth transfer (MW) |
South-to- Central transfer (MW) | | | | | | | | | | | Number of loads shed in north | MW load shedding in north | Number of loads shed in central | MW load shedding in central | Number of loads shed in north | MW load shedding in north | Number of loads shed in central | MW load shedding in north | Max. number of shunt trips in north | Max. number of shunt trips in central |
| 4600 | 2600 | 6 | 424.14 | 13 | 1043.65 | 4 | 402.14 | | | 12 | 8 | 4600 | 2800 | 6 | 424.14 | 13 | 1043.65 | 5 | 529.88 | | | | | 4600 | 3000 | 6 | 424.14 | 13 | 1043.65 | 5 | 529.88 | | | | | 4800 | 1800 | 7 | 538.48 | | | 9 | 867.05 | | | | | 4800 | 2000 | 12 | 981.88 | | | 5 | 503.82 | | | | |
|
|
(b) |
|
3-generator shedding (Plant 1: combined-cycle units; Plant 2: coal units; Plant 3: LNG units) |
4-bus-tie switching |
5-postaction Power flow violation | Plant 1 | Plant 2 | Plant 3 | Bus-tie 1 | Bus-tie 2 | Voltage | Thermal | GT 1~4 | GT 5~8 | Unit 1 | Unit 2 | Unit 1 | Unit 2 | Unit 3 |
| 1 | 2 | 1 | 1 | | | | | |
1 | | 1 | 2 | 1 | 1 | 2 | | | | | | | 1 | 2 | 1 | 1 | 2 | | | | | | | 2 | | 1 | 2 | | | | | | | | 1 | | 1 | 2 | | | | | | | |
|
|