Research Article

Performance-Based Multiobjective Optimal Seismic Retrofit Method for a Steel Moment-Resisting Frame Considering the Life-Cycle Cost

Table 4

Optimal retrofit scheme of the nine-story SMRF for performance objective .

BeforeScheme  1Scheme  2Scheme  3Scheme  4Scheme  5Scheme  6Scheme  7

Number of retrofit connections023304047505879
Retrofit locationX1, X8-9
X23, X25
X28–29
X41, X45
X48, X51
X55, X62
X64, X67
X71, X73
X76-77
X81, X83
X86-87
X2-3, X14
X18-19
X21, X24
X32, X34
X37, X40
X46, X47
X52 X55–59
X62, X67
X69 X70–72
X74, X78
X81
X86-87
X3, X7, X11
X19–21
X23-24
X28
X30–34
X36–38
X44, X48
X51-X52
X54 X56-57
X64–66
X68, X71
X75 X77–80
X82–86
X90
X2–4, X7
X11, X13
X17 X21-22
X25–27
X29–32
X34, X36
X38–40
X42-43
X47–51
X54–X56
X58, X60
X62, X65
X69 X71–73
X75-76
X78, X80
X83-84
X86–88
X1, X4 X8–12
X14, X16
X20 X23-24
X26, X29
X32–37
X39, X42
X45–49
X53, X55
X57 X60-61
X63–65
X67, X69
X71-72
X74-75
X78 X80–82
X86–90
X1, X3–6
X8–X10
X15, X18
X20, X22
X24–28
X31–X35X41–
X44X46-47
X49–
X52X54–
X57X59-
X60X63–
X66X68–70
X72
X75–
X77X79–84
X86
X88-89
X1
X3–13
X15–21
X24–33
X35–37
X39–46
X49–62
X65–79
X81–90
Initial retrofit cost
(thousand dollars)
0460600800940 1,0001,1601,580
Lifetime seismic damage cost
(thousand dollars)
1,8391,5051,3271,1641,1471,0931,0771,041
Maximum interstory drift ratio (%)5.714.824.484.124.264.064.014.23
Dissipated energy
(kN·m)
3,522.714,304.614,424.634,814.294,931.915,022.905,125.605,716.21