Research Article

Methodology for Supply Chain Integration: A Case Study in the Artisan Industry of Footwear

Table 2

Comparison of the results obtained after line balancing according to the modification of the simulation model.

ParameterUnbalanced systemBalanced System
Mean (minutes)Standard deviation (minutes)Mean (minutes)Standard deviation (minutes)

Total manufacturing time (three products)1252.45.91121.17.2
Product 1
 Manufacturing cycle591.47.2550.34.2
 Cycle time (batch)22.00.220.10.1
Product 2
 Manufacturing cycle469.83.0417.52.4
 Cycle time (batch)21.00.219.80.1
Product 3
 Manufacturing cycle457.03.0392.01.8
 Cycle time (batch)21.00.119.00.2

ParameterMean (%)Standard deviation (%)Mean (%)Standard deviation (%)

Workers
 Worker 163.30.481.50.5
 Worker 288.90.166.60.5
 Worker 374.20.567.90.6
 Worker 461.20.457.10.4
 Worker 546.80.866.60.5
 Worker 623.60.164.50.5

Line efficiency56.073.6