Research Article

The Integration of Group Technology and Simulation Optimization to Solve the Flow Shop with Highly Variable Cycle Time Process: A Surgery Scheduling Case Study

Table 3

The error between the real system and simulation.

Compare (average)SystemSimulationError (%)

Waiting time46.1443.107