Research Article

Three-Echelon Inventory Model with Permissible Delay in Payments under Controllable Lead Time and Backorder Consideration

Table 1

Lead time data of numerical example.

Lead time component, Normal duration, (days)Minimum duration, (days)Crashing cost, ($/day)

120141.2
216105