Journals
Publish with us
Publishing partnerships
About us
Blog
Mathematical Problems in Engineering
Journal overview
For authors
For reviewers
For editors
Table of Contents
Special Issues
Mathematical Problems in Engineering
/
2014
/
Article
/
Tab 7
/
Research Article
Building Cost Function 3D Benchmarks to Improve the Economic Statistical Design of
Control Charts
Table 7
Accuracies of the 3D Vis method in comparison with HJ and GA: exponential failure distribution.
Method
0.05
84
3.9674
1.4442
0.1487
0.1984
159.84
0.25
0.25
84
2.7926
1.4471
0.1479
0.1992
337.63
0.50
87
3.8406
1.4855
0.1374
0.1986
448.12
0.05
27
2.7447
1.5725
0.1158
0.1525
229.47
HJ
0.50
0.25
24
1.4118
1.4728
0.1408
0.1643
464.81
0.50
22
1.1061
1.4715
0.1412
0.1911
609.54
0.05
12
1.8757
2.1508
0.0315
0.0945
262.03
1.00
0.25
12
0.8472
2.1153
0.0344
0.0887
304.87
0.50
11
0.5785
2.0766
0.0378
0.1075
300.81
0.05
89
3.8265
1.5060
0.1321
0.1969
161.97
0.25
0.25
93
2.9533
1.5691
0.1166
0.1999
343.15
0.50
86
2.8405
1.4692
0.1418
0.1978
450.08
0.05
27
2.8190
1.5358
0.1246
0.1440
229.50
GA
0.50
0.25
24
1.4427
1.4396
0.1500
0.1562
464.62
0.50
24
1.1698
1.4395
0.1500
0.1562
609.44
0.05
10
1.6132
2.2231
0.0262
0.1738
263.88
1.00
0.25
10
0.6060
2.2469
0.0246
0.1800
308.33
0.50
9
0.5188
2.0447
0.0409
0.1697
302.14
0.05
84
4.3500
1.4400
0.1499
0.1972
159.40
0.25
0.25
84
2.8000
1.4400
0.1499
0.1972
337.43
0.50
84
3.7400
1.4400
0.1499
0.1972
446.46
0.05
27
2.7700
1.5700
0.1164
0.1519
229.46
3D Vis
0.50
0.25
23
1.4100
1.4400
0.1499
0.1690
464.58
0.50
21
1.0900
1.4400
0.1499
0.1972
608.95
0.05
12
1.8500
2.1700
0.0300
0.0978
262.01
1.00
0.25
11
0.8000
2.1000
0.0357
0.1119
304.87
0.50
11
0.5700
2.0700
0.0385
0.1063
300.79