Research Article

A Two-Stage Model for Project Optimization in Transportation Infrastructure Management System

Table 2

Results of conventional method.

YearNo. of segments to be treatedLength of road to be treated (m)Area of pavement to be treated (m2)Total maintenance cost ( 10,000)Average PCI of pavement networkAverage PII of pavement network

20057824152269404244090.27572719
20064313433173309118888.58 (minimal)302004
20077320923257218214587.88621756
2008133379724616832820 (maximal)89.261131875
200912133224446845281090.77962347
201011829992366621235692.51749037
201111531383435860255994.38864322
20127919932279639137095.09551289
20136315851224198103995.13 (maximal)340663
2014348620130474559 (minimal)94150450
Total85723548230452511928691.78 (average)6246469