Research Article

Spillways Scheduling for Flood Control of Three Gorges Reservoir Using Mixed Integer Linear Programming Model

Table 2

Water release relationships of spillways.

Water level (m) Reservoir storage (billion m3)Water releases (m3/s) Turbines (26 units) Total release
Deep outletsFloats outletsDesilting outletsSurface outlets
(23 outlets)(2 outlets)(7 outlets)(22 outlets)

13512.40335001002200/2210057900
14014.70358007002300/2300061800
15522.80418003500//2520070500
15824.81429003900/02560072400
16026.20436004100/8002590074400
16530.02454004600/58002580081600