Research Article

Decision of Multimodal Transportation Scheme Based on Swarm Intelligence

Table 1

Transportation costs/transportation time/transportation risk/transportation capacity of different transportation modes.

Start nodeTerminal nodeTransportation modeTransportation costs/yuanTransportation time/hourTransportation riskTransportation capacity

O1Railway3511120
O1Road2023115
O1Waterway181.5190
O1Aviation400.52120
O2Railway250.81100
O2Road151.52115
O2Waterway1311120
O2Aviation350.32125
O3Railway301.21120
O3Road182.22.595
O3Waterway131.81.2110
O3Aviation360.51.8100
14Railway451.5190
14Road252.53110
14Waterway2021120
14Aviation420.72110
24Railway5022100
24Road3034105
24Waterway302.52105
24Aviation440.9290
25Railway552.52100
25Road353.54100
25Waterway322.82130
25Aviation461.2295
26Railway653.5395
26Road454.54.5100
26Waterway333.53110
26Aviation501.82.5110
28Railway7044110
28Road5055100
28Waterway5843150
28Aviation5522.5100
35Railway431.41100
35Road222.32.5110
35Waterway2021120
35Aviation400.81.8110
46Railway2411100
46Road161.52115
46Waterway2411120
46Aviation300.32125
47Railway3523105
47Road253495
47Waterway2022120
47Aviation381.52.5100
57Railway3523.5100
57Road242.53.5100
57Waterway301.82115
57Aviation361.52.5100
58Railway3511120
58Road2023115
58Waterway321.5190
58Aviation400.52120
6DRailway301.52100
6DRoad202395
6DWaterway181.52120
6DAviation3512125
76Railway401.52100
76Road202.52.5110
76Waterway2421120
76Aviation4312110
78Railway4223100
78Road202.53110
78Waterway252.52120
78Aviation451.54110
8DRailway451.5190
8DRoad252.53110
8DWaterway2021120
8DAviation420.72110