Journals
Publish with us
Publishing partnerships
About us
Blog
Mathematical Problems in Engineering
+
Journal Menu
Journal overview
For authors
For reviewers
For editors
Table of Contents
Special Issues
Submit
Mathematical Problems in Engineering
/
2014
/
Article
/
Fig 5
Research Article
Scheduling Additional Train Unit Services on Rail Transit Lines
Figure 5
Track occupation of turnback operation process at a terminal.
(a)
Turnback operation with crossover located in advance of a station (TAS)
(b)
Turnback operation with crossover located in back of a station (TBS)