Table of Contents Author Guidelines Submit a Manuscript
Mathematical Problems in Engineering
Volume 2015 (2015), Article ID 236958, 17 pages
http://dx.doi.org/10.1155/2015/236958
Research Article

Environmental and Economic Optimization Model for Electric System Planning in Ningxia, China: Inexact Stochastic Risk-Aversion Programming Approach

1Research Institute of Technology Economics Forecasting and Assessment, School of Economics and Management, North China Electric Power University, Beijing 102206, China
2Environmental Systems Engineering Program, Faculty of Engineering, University of Regina, Regina, SK, Canada S4S 0A2
3MOE Key Laboratory of Regional Energy Systems Optimization, S&C Resources and Environmental Research Academy, North China Electric Power University, Beijing 102206, China

Received 10 June 2014; Accepted 23 August 2014

Academic Editor: Carsten Proppe

Copyright © 2015 L. Ji et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Linked References

  1. M. Zhang, X. Liu, W. Wang, and M. Zhou, “Decomposition analysis of CO2 emissions from electricity generation in China,” Energy Policy, vol. 52, pp. 159–165, 2013. View at Publisher · View at Google Scholar · View at Scopus
  2. M. A. Al-Mayyahi, A. F. A. Hoadley, and G. P. Rangaiah, “A novel graphical approach to target CO2 emissions for energy resource planning and utility system optimization,” Applied Energy, vol. 104, pp. 783–790, 2013. View at Publisher · View at Google Scholar · View at Scopus
  3. H. M. I. Pousinho, V. M. F. Mendes, and J. P. S. Catalão, “A risk-averse optimization model for trading wind energy in a market environment under uncertainty,” Energy, vol. 36, no. 8, pp. 4935–4942, 2011. View at Publisher · View at Google Scholar · View at Scopus
  4. D. Buoro, M. Casisi, A. De Nardi, P. Pinamonti, and M. Reini, “Multicriteria optimization of a distributed energy supply system for an industrial area,” Energy, vol. 58, pp. 128–137, 2013. View at Publisher · View at Google Scholar · View at Scopus
  5. Y. Tohidi, F. Aminifar, and M. Fotuhi-Firuzabad, “Generation expansion and retirement planning based on the stochastic programming,” Electric Power Systems Research, vol. 104, pp. 138–145, 2013. View at Publisher · View at Google Scholar · View at Scopus
  6. A. L. Yang, G. H. Huang, Y. R. Fan, and X. D. Zhang, “A fuzzy simulation-based optimization approach for groundwater remediation design at contaminated aquifers,” Mathematical Problems in Engineering, vol. 2012, Article ID 986867, 13 pages, 2012. View at Publisher · View at Google Scholar · View at MathSciNet
  7. W. T. Chen, Y. P. Li, G. H. Huang, X. Chen, and Y. F. Li, “A two-stage inexact-stochastic programming model for planning carbon dioxide emission trading under uncertainty,” Applied Energy, vol. 87, no. 3, pp. 1033–1047, 2010. View at Publisher · View at Google Scholar · View at Scopus
  8. M. W. Li, Y. P. Li, and G. H. Huang, “An interval-fuzzy two-stage stochastic programming model for planning carbon dioxide trading under uncertainty,” Energy, vol. 36, no. 9, pp. 5677–5689, 2011. View at Publisher · View at Google Scholar · View at Scopus
  9. S. Mirkhani and Y. Saboohi, “Stochastic modeling of the energy supply system with uncertain fuel price—a case of emerging technologies for distributed power generation,” Applied Energy, vol. 93, pp. 668–674, 2012. View at Publisher · View at Google Scholar · View at Scopus
  10. P. Jirutitijaroen, S. Kim, O. Kittithreerapronchai, and J. Prina, “An optimization model for natural gas supply portfolios of a power generation company,” Applied Energy, vol. 107, pp. 1–9, 2013. View at Publisher · View at Google Scholar · View at Scopus
  11. Y. Xu and X. S. Qin, “Agricultural effluent control under uncertainty: an inexact double-sided fuzzy chance-constrained model,” Advances in Water Resources, vol. 33, no. 9, pp. 997–1014, 2010. View at Publisher · View at Google Scholar · View at Scopus
  12. P. Guo, G. H. Huang, L. He, and Y. P. Cai, “ICCSIP: an inexact chance-constrained semi-infinite programming approach for energy systems planning under uncertainty,” Energy Sources A, vol. 30, no. 14-15, pp. 1345–1366, 2008. View at Publisher · View at Google Scholar · View at Scopus
  13. Y. L. Xie, Y. P. Li, G. H. Huang, and Y. F. Li, “An interval fixed-mix stochastic programming method for greenhouse gas mitigation in energy systems under uncertainty,” Energy, vol. 35, no. 12, pp. 4627–4644, 2010. View at Publisher · View at Google Scholar · View at Scopus
  14. Y. P. Li and G. H. Huang, “Electric-power systems planning and greenhouse-gas emission management under uncertainty,” Energy Conversion and Management, vol. 57, pp. 173–182, 2012. View at Publisher · View at Google Scholar · View at Scopus
  15. C. Dong, G. H. Huang, Y. P. Cai, and Y. Liu, “Robust planning of energy management systems with environmental and constraint-conservative considerations under multiple uncertainties,” Energy Conversion and Management, vol. 65, pp. 471–486, 2013. View at Publisher · View at Google Scholar · View at Scopus
  16. Y. P. Cai, G. H. Huang, Z. F. Yang, and Q. Tan, “Identification of optimal strategies for energy management systems planning under multiple uncertainties,” Applied Energy, vol. 86, no. 4, pp. 480–495, 2009. View at Publisher · View at Google Scholar · View at Scopus
  17. L. Ji, D. X. Niu, and G. H. Huang, “An inexact two-stage stochastic robust programming for residential miro-gird management based on random demand,” Energy, vol. 67, pp. 186–199, 2014. View at Google Scholar
  18. G. C. Li, G. H. Huang, C. Z. Wu, Y. P. Li, Y. M. Chen, and Q. Tan, “TISEM: a two-stage interval-stochastic evacuation management model,” Journal of Environmental Informatics, vol. 12, no. 1, pp. 64–74, 2008. View at Publisher · View at Google Scholar · View at Scopus
  19. Q. G. Lin, G. H. Huang, B. Bass, and X. S. Qin, “IFTEM: an interval-fuzzy two-stage stochastic optimization model for regional energy systems planning under uncertainty,” Energy Policy, vol. 37, no. 3, pp. 868–878, 2009. View at Publisher · View at Google Scholar · View at Scopus
  20. X. S. Qin, G. H. Huang, B. Chen, and B. Y. Zhang, “An interval-parameter waste-load-allocation model for river water quality management under uncertainty,” Environmental Management, vol. 43, no. 6, pp. 999–1012, 2009. View at Publisher · View at Google Scholar · View at Scopus
  21. Y. L. Xie and G. H. Huang, “An optimization model for water resources allocation risk analysis under uncertainty,” Journal of Hydroinformatics, 2013. View at Publisher · View at Google Scholar
  22. A. Lorca and J. Prina, “Power portfolio optimization considering locational electricity prices and risk management,” Electric Power Systems Research, vol. 109, pp. 80–89, 2014. View at Google Scholar
  23. L. W. Tauer, “Target MOTAD,” American Journal of Agricultural Economics, vol. 65, pp. 606–610, 1983. View at Google Scholar
  24. E. A. Yeager and M. R. Langemeier, “Economic efficiency and downside risk,” Applied Economics, vol. 45, no. 36, pp. 5012–5020, 2013. View at Publisher · View at Google Scholar · View at Scopus
  25. H. M. Ghadikolaei, A. Ahmadi, J. Aghaei, and M. Najafi, “Risk constrained self-scheduling of hydro/wind units for short term electricity markets considering intermittency and uncertainty,” Renewable and Sustainable Energy Reviews, vol. 16, no. 7, pp. 4734–4743, 2012. View at Publisher · View at Google Scholar · View at Scopus
  26. D. Cumova and D. Nawrocki, “Portfolio optimization in an upside potential and downside risk framework,” Journal of Economics and Business, vol. 71, pp. 68–89, 2014. View at Google Scholar
  27. Y. L. Xie and G. H. Huang, “Development of an inexact two-stage stochastic model with downside risk control for water quality management and decision analysis,” Stochastic Environmental Research and Risk Assessment, vol. 28, no. 6, pp. 1555–1575, 2014. View at Google Scholar
  28. X. Qin, Y. Xu, and J. Su, “Municipal solid waste-flow allocation planning with trapezoidal-shaped fuzzy parameters,” Environmental Engineering Science, vol. 28, no. 8, pp. 573–584, 2011. View at Publisher · View at Google Scholar · View at Scopus
  29. N. Zhang, Y. P. Li, and W. W. Huang, “An inexact two-stage waterquality management model for supporting sustainable development in arural system,” Journal of Environmental Informatics, vol. 24, no. 1, pp. 52–64, 2014. View at Google Scholar
  30. J. R. Birge and F. V. Louveaux, “A multicut algorithm for two-stage stochastic linear programs,” European Journal of Operational Research, vol. 34, no. 3, pp. 384–392, 1988. View at Publisher · View at Google Scholar · View at Zentralblatt MATH · View at MathSciNet · View at Scopus
  31. G. H. Huang, B. W. Baetz, and G. G. Patry, “An interval linear programming approach for municipal solid waste management planning under uncertainty,” Civil Engineering and Environmental Systems, vol. 9, pp. 319–335, 1992. View at Google Scholar
  32. G. H. Huang, “IPWM: an interval parameter water quality management model,” Engineering Optimization, vol. 26, no. 2, pp. 79–103, 1996. View at Publisher · View at Google Scholar · View at Scopus
  33. W. Li, Y. P. Li, C. H. Li, and G. H. Huang, “An inexact two-stage water management model for planning agricultural irrigation under uncertainty,” Agricultural Water Management, vol. 97, no. 11, pp. 1905–1914, 2010. View at Publisher · View at Google Scholar · View at Scopus
  34. J. C. Bean, J. L. Higle, and R. L. Smith, “Capacity expansion under stochastic demands,” Operations Research, vol. 40, no. 2, pp. 210–216, 1992. View at Publisher · View at Google Scholar
  35. A. Aseeri and M. J. Bagajewicz, “New measures and procedures to manage financial risk with applications to the planning of gas commercialization in Asia,” Computers and Chemical Engineering, vol. 28, no. 12, pp. 2791–2821, 2004. View at Publisher · View at Google Scholar · View at Scopus