Typical construction cost breakdown of an onshore WF.
| WTs (%) | 65–75 | Electrical infrastructure (%) | 1–10 | Collector system | 6–9 | Transmission system | 2-3 | Substation | 2-3 | Civil work (%) | 0–5 | Installation and transport (%) | 0–2 | Others (%) | 5 |
|
|