Research Article

Optimal Wind Turbines Micrositing in Onshore Wind Farms Using Fuzzy Genetic Algorithm

Table 2

Typical construction cost breakdown of an onshore WF.

WTs (%)65–75
Electrical infrastructure (%)1–10
 Collector system6–9
 Transmission system2-3
 Substation2-3
Civil work (%)0–5
Installation and transport (%)0–2
Others (%)5