Research Article

Efficient Heuristic Algorithm for Scheduling Two-Stage Hybrid Flowshop with Sequence-Dependent Setup Times

Table 2

Performance results of the tested methods across the different job sizes.

# of jobsGASANEH+BS+

5080.075.875.474.8
(0)(7)(6)(17)

100154.0141.0137.5137.2
(0)(2)(9)(19)

200314.2283.5273.2273.2
(0)(3)(11)(16)

400636.2609.9530.5530.6
(0)(1)(18)(11)

Overall296.1277.5254.1253.9
(0)(13)(44)(63)

Average makespan value.
Number of instances that the corresponding method gave the best solution.