Research Article

Condition-Based Maintenance Strategy for Production Systems Generating Environmental Damage

Table 2

The obtained optimal solution for periodic inspection policy.

(Ton) (week) (%)CM cost ($) (%)PM cost ($)Inspection
cost ($)
Environmental
penalty cost ($)
ā€‰
($/week)

2717.7616082.244121.081080.022007.1123.94