Research Article
Sensitivity Analysis of Temperature Control Parameters and Study of the Simultaneous Cooling Zone during Dam Construction in High-Altitude Regions
Table 7
Temperature control measures.
| Concrete temperature control measures | Control index |
| Pouring temperature | High restraint zone | ≤12°C | Low restraint zone | ≤13°C | No restraint zone | ≤14°C |
|
Simultaneous cooling | Beginning stage of simultaneous cooling | Middle stage | Height of the simultaneous cooling | 18 m below elevation 3,300 m 27 m above elevation 3,300 m |
| Distance between water pipes | High restraint zone | 1.5 m 1.5 m | Low restraint zone | 1.5 m 3.0 m | No restraint zone | 1.5 m 3.0 m |
| Water pipe cooling | First stage cooling | Water temperature | 8.0°C | Flow | 1.5 m3·h−1 | Starting age | 0.0 day | Targeted temperature | 19°C-20°C | Middle stage of cooling | Water temperature | 12°C | Flow | 0.8 m3·h−1 | Starting age | 30day–45 day | Targeted temperature | 16°C–18°C | Second stage cooling | Water temperature | 6°C–8°C | Flow | 1.0 m3·h−1 | Starting | ≥90 day | Targeted temperature | 10°C |
| Pouring thickness | High restraint zone | 1.5 m | Low restraint zone and no restraint zone | 3.0 m |
| Intervals between layers | 10 day |
| Surface insulation | 5 cm vinyl insulation board |
|
|