Abstract

This paper considers the delayed age replacement policy, in which the lifetimes of all units are assumed to be uncertain variables, and the lifetime of the first unit has an uncertainty distribution which is different from the others. A delayed age replacement model which is concerned with finding the optimal replacement time to minimize the expected cost is developed. In the policy, the optimal replacement time is irrelevant to the uncertain distribution of lifetime of the first unit over the infinite time span.

1. Introduction

The replacement policy for the unit based on its age is called age replacement policy, which means that a unit is always replaced at failure or at an age , whichever occurs first. Age replacement policy is easy to operate especially for multicomponent systems, so it is one of the widely used maintenance policies. Age replacement policies have been studied theoretically by many authors. In 1965, Barlow and Proschan [1] studied the basic replacement policies. Furthermore, age replacement policy with continuous discounting was proposed by Fox in 1966 [2]. Scheaffer [3] considered optimum age replacement policies with an increasing cost factor. Later in 1979, Cleroux et al. [4] studied age replacement policy with random charges. Cleroux and Hanscom [5] studied a general age replacement model with minimal repair. Boland and Proschan [6] studied the case when the repair cost increases with age. Jhang and Sheu [7] proposed an opportunity-based age replacement policy with minimal repair. For more development of replacement policies, readers can refer to Nakagawa [8].

In the above literatures, the lifetime of a unit is regarded as a random variable, and probability theory is employed to deal with the optimization of the replacement policy. The probability theory is applicable only when we have the large enough sample size. However when no samples are available in some situation, we have to invite some domain experts to evaluate the belief degree that each event will occur. Since human tends to overweight unlikely events [9], the belief degree may have a much larger range than the real frequency. Therefore, it is unreasonable to employ stochastic method for the particularity of the problem. In order to rationally deal with belief degrees, uncertainty theory was founded by Liu in 2007 [10],and was refined by Liu in 2010 [11] based on normality, duality, subadditivity, and product axioms. Nowadays, uncertainty theory has become a branch of axiomatic mathematics for modeling human uncertainty, and some applications can be found in various fields.

Yao and Ralescu [12] firstly proposed the uncertain age replacement policy, where the lifetimes of all units are assumed as iid uncertain variables. However, in practice of maintenance engineering, the lifetime of the first unit may be quite different from the remains. If the age is unchanging in the age replacement policy, only the lifetime of the first unit has an uncertainty distribution which is different from the others. The first replacement point may be observed at a delayed time and call it delayed age replacement policy as the delayed renewal process. In this paper, we will consider the delayed age replacement policy with uncertain lifetimes of all units, and the lifetime of first unit has a different uncertainty distribution from the others. And then, a delayed age replacement model to find the optimal predetermined replacement time will be developed.

This paper is organized as follows: Section 2 recalls some basic concepts and properties about uncertainty theory which will be used throughout the paper. In Section 3, delayed age replacement policy in uncertain environment is introduced and the expected cost over infinite time is proposed; thus the optimal age replacement time will be derived. Numerical example is given in Section 4, followed by Section 5 where we conclude the paper.

2. Preliminaries

Let be a nonempty set. is a -algebra on . Each element in the -algebra is called an event. Uncertain measure is a function from to . In order to present an axiomatic definition of uncertain measure, it is necessary to assign to each event a number which indicates the belief degree that the event will occur. In order to ensure that the number has certain mathematical properties, Liu [10] proposed the following three axioms.Axiom 1: (normality axiom) for the universal set .Axiom 2: (duality axiom) for any event .Axiom 3: (subadditivity axiom) For every countable sequence of events , we have

Definition 1 (Liu [10]). The set function is called an uncertain measure if it satisfies the normality, duality, subadditivity, and product axioms.

Definition 2 (Liu [10]). An uncertain variable is a measurable function from the uncertainty space to the set of real numbers; that is, for any Borel set of real numbers, the set is an event.

In order to describe an uncertain variable, a concept of uncertainty distribution is introduced as follows.

Definition 3 (Liu [10]). The uncertainty distribution of an uncertain variable is defined by for any real number .

Expected value is the average of an uncertain variable in the sense of uncertain measure and represented the size of uncertain variable.

Definition 4 (Liu [10]). Let be an uncertain variable. Then the expected value of is defined by provided that at least one of the two integrals is finite.

An uncertain process [13] is essentially a sequence of uncertain variables indexed by time. Renewal process is one of the most important uncertain processes in which events occur continuously and independently of one another in uncertain times.

Definition 5 (Liu [13]). Let be iid positive uncertain variables. Define and for . Then the uncertain process is called an uncertain renewal process.

Age replacement means that an element is always replaced at failure or at an age . If denote the lifetimes of the elements which are iid uncertain variable with a common uncertainty distribution, then the actual lifetimes of the elements are iid uncertain variables which may generate an uncertain renewal process:

Yao and Ralescu [12] investigated the uncertain age replacement policy and obtained the long-run average replacement cost as follows: where is the replacement cost function.

3. Delayed Age Replacement Policy

Consider an age replacement policy in which a unit is replaced at constant time after its installation or at failure, whichever occurs first. We assume that failures are instantly detected and replaced with a new one, where its replacement time is negligible. Assume that the lifetimes of the units are uncertain variables , and has an uncertainty distribution which is different from the others. A net unit is installed at time . Then, the actual lifetimes of the units are uncertain variables , which generate an uncertain delayed renewal process: where has an uncertainty distribution which is different from the others. We consider the problem of minimizing the expected cost per unit of time for an infinite time span. For simplicity, we introduce the following cost function: where is the cost of replacing the unit at age and   is the cost of replacing the unit at failure, which is larger than . Then denotes the cost to replace the th unit, and the expected total replacement cost before time is The average cost over the time is expressed as

Delayed age replacement policy aims at finding an optimal time to minimize the average replacement cost; that is,

Lemma 6 (Yao and Ralescu [12]). Let be a positive uncertain variable with an uncertainty distribution . Given that with , the uncertain variable has an uncertainty distribution

Lemma 7 (Yao and Ralescu [12]). Let be an uncertain renewal process with iid uncertain interarrival times , and let be a positive function. Then have a common uncertainty distribution.

Theorem 8. Let be a sequence of positive uncertain variables. If has an uncertainty distribution and has a common uncertainty distribution , is an uncertain renewal process with uncertain interarrivals . Given that with , the uncertainty distribution of the uncertain variable satisfies

Proof. Since we have The last second inequality holds because of Lemma 6.
Thus The theorem is proved.

Theorem 9. Let be a sequence of positive uncertain variables. If has an uncertainty distribution and has a common uncertainty distribution , is an uncertain renewal process with uncertain interarrivals . Given that with the uncertainty distribution of the uncertain variable satisfies

Proof.
Case 1. Assume that . Let ; then we have It is concluded that Case 2. Assume that . Firstly, we will prove that for any provided that is large enough. For any when , it can be obtained that That means It is equivalent of provided that is larger than .
According to the monotonicity of uncertain distribution, for any , we obtain that Letting , we have Case 3. Assume that . For any and fixing when we have Thus That is provided that is large enough. Therefore, it can be obtained that Letting , for any ,we have The theorem is proved.

Theorem 10. Let be a sequence of positive uncertain variables. If has an uncertainty distribution and has a common uncertainty distribution , is an uncertain renewal process with uncertain interarrivals . Given that with , then

Proof. Let Thus Note that by Theorem 8 and by Theorem 9. According to the Fatou lemma, we can obtain So we have The theorem is proved. It follows from Theorem 10 that the optimal replacement time is just the replacement time which satisfies

4. Number Example

Let be a sequence of positive uncertain variables. If has a lognormal uncertainty distribution where and are real numbers with and has a common lognormal uncertainty distribution where and are real numbers with , let be an uncertain renewal process with uncertain interarrivals for any . Given that with , then it follows from Theorem 10 that the expected cost over infinite time span is The optimal replacement time is just the replacement time which satisfies

In particular, let , , , and ; we give the changing trend of the expected cost function with time in Figure 1. It can be seen obviously from Figure 1 that the expected cost is monotone increasing firstly and then monotone decreasing in time . We can obtain the optimal replacement time and the minimum cost is 2.1117.

5. Conclusions

This paper first studied the delayed age replacement policy in uncertain environment. It gave the expected costs in infinite time span and found the optimal replacement time which minimizes the expected cost. The optimal time to replace the unit was irrelevant to the uncertain distribution of the first unit. In addition, a number example was gave.

Conflict of Interests

The authors declare that there is no conflict of interests regarding the publication of this paper.

Acknowledgments

This work was supported by the Young Scientists Fund of the National Natural Science Foundation of China (61403395), the Natural Science Foundation of Tianjin Grant 13JCYBJC39000, and Special Fund of the Civil Aviation University of China of the Fundamental Research Funds for the Central Universities under Grant no. 3122013D004.