Research Article

Prediction Technology of Power Transmission and Transformation Project Cost Based on the Decomposition-Integration

Figure 4

Parameter optimization based on grid search method. The SVR parameter selection results (3D view) [grid search method]. Best CVMSE = 0.13206.