Research Article

Prediction Technology of Power Transmission and Transformation Project Cost Based on the Decomposition-Integration

Table 10

The error of weighted summation.

1234567

The actual value293.48266.96269.11257.21274.55257.18362.52
Predicted values285.74273.52267.07250.79271.95253.63368.69
Error−2.64%2.46%−0.76%−2.50%−0.95%−1.38%1.70%