Research Article
Prediction Technology of Power Transmission and Transformation Project Cost Based on the Decomposition-Integration
Table 10
The error of weighted summation.
| | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| The actual value | 293.48 | 266.96 | 269.11 | 257.21 | 274.55 | 257.18 | 362.52 | Predicted values | 285.74 | 273.52 | 267.07 | 250.79 | 271.95 | 253.63 | 368.69 | Error | −2.64% | 2.46% | −0.76% | −2.50% | −0.95% | −1.38% | 1.70% |
|
|