Research Article
Prediction Technology of Power Transmission and Transformation Project Cost Based on the Decomposition-Integration
Table 3
The average MIV values of the factors.
| Factor | MIV |
| The number of this period main transformer | 3.1 | Construction area (main control building) | 2.9 | Land area (total station) | 2.7 | Cable | 2.7 | The main transformer capacity | 2.6 | Area | 2.1 | Steel frame and other materials | 1.9 | Fill volume of site formation | 1.7 | Foundation treatment method | 1.3 | Altitude | 1 | Land area (inside the walls) | 0.8 | Cable trench | 0.7 | Pit road length | 0.6 | Pollution level | 0.5 | Excavation volume of site | 0.5 | Volume of the ditch pool | 0.3 | Construction area (total station) | 0.3 | Ground endurance | 0.2 | The weight of steel | 0.2 | The weight of the cement | 0.1 |
|
|