Research Article

Prediction Technology of Power Transmission and Transformation Project Cost Based on the Decomposition-Integration

Table 3

The average MIV values of the factors.

FactorMIV

The number of this period main transformer3.1
Construction area (main control building)2.9
Land area (total station)2.7
Cable2.7
The main transformer capacity2.6
Area2.1
Steel frame and other materials1.9
Fill volume of site formation1.7
Foundation treatment method1.3
Altitude1
Land area (inside the walls)0.8
Cable trench0.7
Pit road length0.6
Pollution level0.5
Excavation volume of site0.5
Volume of the ditch pool0.3
Construction area (total station)0.3
Ground endurance0.2
The weight of steel0.2
The weight of the cement0.1