Research Article

Prediction Technology of Power Transmission and Transformation Project Cost Based on the Decomposition-Integration

Table 5

The construction cost prediction error.

1234567

The actual value96.7868.5280.3961.2269.3468.15111.96
Predicted values101.3263.2885.3462.9463.1566.19118.84
Error4.70%−7.65%6.17%2.80%−8.94%−2.88%6.15%