Research Article
Prediction Technology of Power Transmission and Transformation Project Cost Based on the Decomposition-Integration
Table 9
Simple integration error.
| | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| The actual value | 293.48 | 266.96 | 269.11 | 257.21 | 274.55 | 257.18 | 362.52 | Predicted values | 302.35 | 273.44 | 271.05 | 245.29 | 279.57 | 264.63 | 353.16 | Error | 3.02% | 2.43% | 0.72% | −4.64% | 1.83% | 2.89% | −2.58% |
|
|