Research Article

A Novel Assembly Line Scheduling Algorithm Based on CE-PSO

Table 4

The job element of the sheet metal parts.

Serial numberJob elementStandard time

1The punching of the sheet metal(10, 10, 15)
2The cutting of the sheet metal(15, 15, 20)
3The tapping of the sheet metal(20, 10, 10)
4The testing of the sheet metal(15, 10, 20)
5The package of the sheet metal(15, 20, 10)