Research Article

Stochastic Optimization for Network-Constrained Power System Scheduling Problem

Table 9

Joint analysis on grid constraints and prioritized load shedding under different number of scenarios-II.

Number of scenarios = 9 Number of scenarios = 16
Without losses With lossesWithout losses With losses
Nonprioritized PrioritizedNonprioritized PrioritizedNonprioritized PrioritizedNonprioritized Prioritized

Lsw [%] [7.17, 10.98][10.03, 13.06][7.17, 11.52][10.02, 13.65][7.17, 10.86][10.02, 12.91] [7.17, 11.43] [10.02, 13.54]
Lsl [%] [0.40, 0.45][0.34, 0.36][0.38, 0.44] [0.34, 0.37][0.40, 0.47][0.34, 0.36] [0.38, 0.44] [0.35, 0.37]
Lsr [%] 0 0 0 0 0 0 0 0
Ploss [%] 0 0[1.55, 1.58] [1.52, 1.55]00[1.55, 1.58][1.53, 1.55]