Research Article

Modeling the Coordinated Operation between Bus Rapid Transit and Bus

Table 2

Optimization costs of different operation modes.

Operation modeOperation costs
(yuan)
Passenger costs (yuan)Total costs
(yuan)

Waiting costsTransfer costsIn-vehicle costs

7365.4514480
7681.7616760
7249.8526410