Mathematical Problems in Engineering / 2015 / Article / Tab 1 / Research Article
Application of Two-Phase Fuzzy Optimization Approach to Multiproduct Multistage Integrated Production Planning with Linguistic Preference under Uncertainty Table 1 Comparison of different models for the multiproduct multistage production planning.
Factor Torabi and Hassini Peidro et al. Jamalnia and Soukhakian The proposed approach Objective function Multiple Single Multiple Multiple Objective for cost Min Min Min Min Additional objectives Max: total value for purchasing Not considered Max: customer satisfaction Max: ASHL and ASL Objective priority Not considered Not considered Considered Considered Preference extent Not considered Not considered Not considered Considered Product family Not considered Considered Considered Considered Epistemic uncertainty Considered Considered Considered Considered External uncertainty Considered Considered Not considered Considered Safety stock Considered Not considered Not considered Considered Backorder Not considered Allowed for single period Allowed for single period Allowed for multiperiod Production route Not considered Not considered Not considered Considered Overtime Not considered Not considered Considered Considered