Table 4: Summary of real data, planned data, and simulation data.

DescriptionCycles per shiftAdvance rate [m/shift]Daily advance rate [m/day]Planned time [days]Average shifts% Error with real case

Planning1.332.44.811723312.28%
Simulation1.162.14.21342670.37%
Real1.182.14.2133266