Supply Chain Coordination Contracts under Double Sided Disruptions Simultaneously

Table 1

Sensitivity analysis for the key parameters.

ParametersChanges (in %)Optimal price Optimal quantity

−50+1+8.78+31.09
−25+0.33+3.84+9.64
+25−0.2−2.99−5.10
+50−0.33−5.33−8.06

−50−0.5+8.78+8.78
−25−0.25+3.84+3.84
+25+0.25−2.99−2.99
+50+0.5−5.33−5.33

−50−6.77−6.77
−25−3.38−3.38
+25+3.38+3.38
+50+6.77+6.77