Research Article

A Study on the Practical Carrying Capacity of Large High-Speed Railway Stations considering Train Set Utilization

Table 1

The generation of relevant data.

20 min30 min40 min50 min60 min

Number of trains after connecting347351354357361
4,5114,5634,6024,6414,693
60,00085,104103,680122,040146,184
13.3018.6522.5326.3031.15
64,79667,80270,05772,31475,321
14.3614.8615.2215.5816.05