Research Article
A Study on the Practical Carrying Capacity of Large High-Speed Railway Stations considering Train Set Utilization
Table 1
The generation of relevant data.
| | 20 min | 30 min | 40 min | 50 min | 60 min |
| Number of trains after connecting | 347 | 351 | 354 | 357 | 361 | | 4,511 | 4,563 | 4,602 | 4,641 | 4,693 | | 60,000 | 85,104 | 103,680 | 122,040 | 146,184 | | 13.30 | 18.65 | 22.53 | 26.30 | 31.15 | | 64,796 | 67,802 | 70,057 | 72,314 | 75,321 | | 14.36 | 14.86 | 15.22 | 15.58 | 16.05 |
|
|