Research Article
Analytical Analysis and Field Observation of Break Line in the Main Roof over the Goaf Edge of Longwall Coal Mines
Figure 1
Schematic arc-top structure above GDE.
(a) Arc-triangle section of the lateral main roof after breakage |
(b) The lateral hinged structure over the EDG (section I-I in Figure 1(a)) |