Journals
Publish with us
Publishing partnerships
About us
Blog
Mathematical Problems in Engineering
Journal overview
For authors
For reviewers
For editors
Table of Contents
Special Issues
Mathematical Problems in Engineering
/
2016
/
Article
/
Tab 10
/
Research Article
The Optimization Model of Earthquake Emergency Supplies Collecting with the Limited Period and Double-Level Multihub
Table 10
Distribution and collecting schemes of emergency supplies supply nodes.
Hub nodes
are assigned to
Collecting quantity of
Collecting time
Collecting costs
,
,
,
(
, 500), (
, 550),
(
, 700), (
, 110)
(
, 280), (
, 260),
(
, 80)
(
, 420), (
, 100)
1.15
2597
,
,
(
, 610), (
, 390)
(
, 320), (
, 280),
(
, 140)
(
, 290), (
, 410),
(
, 230)
1.1
5933
,
,
,
(
, 710)
(
, 140), (
, 270),
(
, 2)
(
, 30), (
, 170),
(
, 370), (
, 340)
2.1
2285