Research Article

The Optimization Model of Earthquake Emergency Supplies Collecting with the Limited Period and Double-Level Multihub

Table 3

Each unit collecting cost of each unit’s emergency supplies under the hub network.


21321.5312
3241.512.121.4
0.510.73.21.41.20.71.8


0.60.210.8
10.70.91.7
0.81.20.71

Note: the stranded costs are 0.1 for unit emergency supplies in the distribution center.