Simulation-Based Optimization for Yard Design at Mega Container Terminal under Uncertainty

Table 1

Input data of the proposed optimization framework for this container terminal.

ItemsUnitData input

() Simulation timeHour30 × 24
() Uncertain throughput
 (i) Random vector with associated probability, , See Figure 5
() Yard handling technology
 (i) Maximum span width of yard craneMeter23.47
 (ii) Block width, Meter16.63
 (iii) Width of transfer lane and driving lane, , Meter20
 (iv) Space required for a TEU, Square meter17.63
() Yard operational parameters
 (i) Monthly operational days, Day30
 (ii) Capacity utilization, 0.7
 (iii) Average cluration of containers, Day5.5
 (iv) Maximum stacking tiers5
 (v) Travel time of yard crane per meter, Second/meter0.45
 (vi) Cycle time required for handling a container, Second77.1
 (vii) Average relocation time, Second74.2
 (viii) Travel time of trucks per meter, , Second/meter0.18
() Cost coefficients
 (i) Capital cost for yard space, CNY/square meter/month8.33
 (ii) Capital cost for yard crane, MCNY/month0.042
 (iii) Variable cost for yard crane, CNY/second0.053
 (iv) Variable cost for truck, , CNY/second0.023
() Investment budgets
 (i) Options, MCNY5, 5.5, 6, 6.5, 7, 7.5