Items | Unit | Data input |
|
() Simulation time | Hour | 30 × 24 |
() Uncertain throughput | | |
(i) Random vector with associated probability, , | | See Figure 5 |
() Yard handling technology | | |
(i) Maximum span width of yard crane | Meter | 23.47 |
(ii) Block width, | Meter | 16.63 |
(iii) Width of transfer lane and driving lane, , | Meter | 20 |
(iv) Space required for a TEU, | Square meter | 17.63 |
() Yard operational parameters | | |
(i) Monthly operational days, | Day | 30 |
(ii) Capacity utilization, | | 0.7 |
(iii) Average cluration of containers, | Day | 5.5 |
(iv) Maximum stacking tiers | | 5 |
(v) Travel time of yard crane per meter, | Second/meter | 0.45 |
(vi) Cycle time required for handling a container, | Second | 77.1 |
(vii) Average relocation time, | Second | 74.2 |
(viii) Travel time of trucks per meter, , | Second/meter | 0.18 |
() Cost coefficients | | |
(i) Capital cost for yard space, | CNY/square meter/month | 8.33 |
(ii) Capital cost for yard crane, | MCNY/month | 0.042 |
(iii) Variable cost for yard crane, | CNY/second | 0.053 |
(iv) Variable cost for truck, , | CNY/second | 0.023 |
() Investment budgets | | |
(i) Options, | MCNY | 5, 5.5, 6, 6.5, 7, 7.5 |
|