Research Article

Stability Analysis of Steel Lining at Pressure Diversion Tunnel Collapse Zone during Operating Period

Figure 13

Comparison of the external pressure head on the steel lining in the three scenarios: (a) at section 0+37.0 m and (b) at section 0+27.0 m.
(a)
(b)