Fix-and-Optimize and Variable Neighborhood Search Approaches for Stochastic Multi-Item Capacitated Lot-Sizing Problems
Table 2
Notations for measuring solution quality.
| Notation | Definition | Quality measure |
| | Average total cost | Lower is better | | Average computational time | Lower is better | | Average proportion of periods with overtime (in %) | Lower is better | | Average -service level (in %) (see [29]) | Higher is better | | Proportion of instances for which a feasible solution with neither overtime nor backlogging has been found by the algorithm (in %) | Higher is better | | Deviation from the average of FO1 (in %) | Lower is better | | Deviation from the best of FO1 (in %) | Lower is better | | Deviation from the average of FO1 (in %) | Lower is better | | Deviation from the of FO1 variants with best (in %) | Lower is better |
| | Deviation from the compared (in %) | Lower is better | | Deviation from the compared (in %) | Lower is better |
|
|