Research Article

Maximum Likelihood Estimation of Model Uncertainty in Predicting Soil Nail Loads Using Default and Modified FHWA Simplified Methods

Table 4

Design outcomes of nail length at different depths for pullout limit state.

MethodNail numberDepth,
Nail length,
NormalLognormal

Default FHWA simplified method10.050.820.84
20.200.850.87
30.350.780.80
40.500.700.72
50.650.620.64
60.800.50
70.950.50
Sum ()4.78 (4.41)4.88 (4.53)

Modified FHWA simplified method10.050.800.80
20.200.820.83
30.350.740.75
40.500.660.67
50.650.580.59
60.80
70.95
Sum ()4.59 (4.18)4.65 (4.25)

Note. Values in brackets are computed nail lengths that correspond to the target reliability index of 2.33; those nail lengths are increased to be 0.50 as per the requirement of FHWA soil nail wall design manual [1, 2], that is, / ≥ 0.50.