Research Article
Site Selection of Waste-to-Energy (WtE) Plant considering Public Satisfaction by an Extended VIKOR Method
Table 4
Assessments by evaluation committee of A1.
| Criteria | DM1 | DM2 | DM3 |
| a1 | EH | H-VH | VH | a2 | H-VH | M-H | M | b1 | VH | M | M-H | b2 | L-M | L-M | VL | b3 | M-H | M | M | C13 | M | L | VL | C14 | L | VL | L | C15 | L | M | L | C21 | H | VH | EH | C23 | M | VL | VL | C31 | VH | VH | VH | C32 | VH | M-H | EH | C33 | H | VH | H | C41 | H | M | H | C42 | M | H | M | C43 | M-H | M | H | d1 | L-M | L | H-VH | d2 | M | M | VH | d3 | M | M | H-VH | e1 | EL-VL | VL | VL | e2 | VL | EL-VL | VL | e3 | L | L | H | C53 | L-M | L | M | C61 | M | VH | M | C62 | M-H | H | M | C63 | VL-L | M | L |
|
|