Research Article
Site Selection of Waste-to-Energy (WtE) Plant considering Public Satisfaction by an Extended VIKOR Method
Table 8
The 2-tuples
, and
by evaluation committee.
| | A1 | A2 | A3 | A4 | A5 |
| | Δ(0.3672) | Δ(0.2945) | Δ(0.1863) | Δ(0.5556) | Δ(0.6746) | | Δ(0.0727) | Δ(0.0379) | Δ(0.0352) | Δ(0.1835) | Δ(0.2937) | | Δ(0.2579) | Δ(0.1161) | Δ(0.0000) | Δ(0.6652) | Δ(1.0000) |
|
|