Research Article

Venture Capital Contracting with Double-Sided Moral Hazard and Fairness Concerns

Table 3

Optimal effort levels.

Parameter

0.00580.01520.0268
0.00580.00990.1490
0.00580.00730.0089
0.00580.00630.0070
0.00580.00220.0013
0.00580.00440.0041
0.00580.00560.0059
0.00580.00610.0065