Research Article
A Mathematical Model for Multiworkshop IPPS Problem in Batch Production
Table 1
Sample coding of BV-IPPS.
| | Code of the workpiece | 2 | 1 | 2 | 1 | 2 | 2 | 1 | 2 | | Code of the sublot of the workpiece | 21 | 11 | 22 | 11 | 21 | 22 | 11 | 21 | | Lot size of each sublot of the workpiece | 26 | 70 | 34 | 70 | 26 | 34 | 70 | 26 | | Code of the machine | 4 | 2 | 1 | 4 | 3 | 1 | 1 | 2 | | Code of the workshop | 2 | 1 | 1 | 2 | 2 | 1 | 1 | 1 | | Process time per one piece of the workpiece | 0.8 | 0.9 | 0.7 | 1.3 | 1 | 0.6 | 1.1 | 0.7 | | Code of the process route | 3 | 2 | 1 | 2 | 3 | 1 | 2 | 3 |
|
|