No. | Roadway name | Roadway type | Roadway section area (m2) | inclination (°) | wind velocity (m/s) | Escape velocity (m/s) |
|
1 | +250 west roadway-+450 ventilation slope | Without rail track | 6.18 | -29.3 | 2.17 | 1.17 |
2 | +450-+570 first ventilation slope | Without rail track | 6.78 | -28.5 | -2.89 | 1.24 |
3 | +820-+930 return air slope | Without rail track | 8.53 | -28.3 | 8.69 | 1.28 |
4 | +450-+570 air shaft | Without rail track | 6.96 | -27.5 | -3.16 | 1.28 |
5 | +250-+450 inclined shaft | Without rail track | 14.35 | -27.5 | -0.82 | 1.39 |
6 | +450 haulage roadway | Rail track | 12.85 | -26.8 | 1.72 | 1.34 |
7 | +150-+250 ventilation slope | Without rail track | 8.77 | -26.6 | -3.39 | 1.32 |
8 | +150-+250 impractical person vehicle slope | Without rail track | 10.87 | -26.2 | -1.02 | 1.45 |
9 | +450 -+570 second ventilation slope | Without rail track | 8.24 | -25.2 | 1.42 | 1.48 |
10 | +570 -+700 first ventilation slope | Without rail track | 9.28 | -24.8 | -2.64 | 1.53 |
11 | +700-+820 ventilation slope | Without rail track | 7.81 | -24.6 | 3.25 | 1.56 |
12 | +450-+570 impractical person vehicle slope | Without rail track | 12.89 | -23.3 | -2.17 | 1.58 |
13 | +570 -+700 second ventilation slope | Without rail track | 9.23 | -22.2 | 1.54 | 1.62 |
14 | +570 uphill slope | Without rail track | 6.60 | -21.8 | -0.94 | 1.69 |
15 | +150-+250 overhead cableway | Without rail track | 14.17 | -21.5 | -2.28 | 1.68 |
16 | +250 belt roadway -+450 ventilation slope | Without rail track | 9.23 | -20.9 | -2.29 | 1.71 |
17 | +450-+570 coal flume slope | Rail track | 1.89 | -20.3 | 1.23 | 0.68 |
18 | +150-+250 auxiliary shaft slope | Without rail track | 8.13 | -19.8 | -3.46 | 1.77 |
19 | +150 air shaft | Without rail track | 7.91 | -18.5 | 1.12 | 1.82 |
20 | +250-+450 belt main inclined shaft | Without rail track | 6.87 | -15.6 | -3.23 | 1.92 |
21 | +570-+700 belt slope | Without rail track | 7.38 | -12.3 | 1.86 | 1.93 |
22 | +250 down crossheading of third face | Without rail track | 5.95 | -11.7 | -1.83 | 2.30 |
23 | +450 down crossheading of fifth face | Without rail track | 7.24 | -8.6 | -0.83 | 2.32 |
24 | +450 up crossheading of fifth face | Without rail track | 9.47 | -6.4 | 0.68 | 2.35 |
25 | +250 up crossheading of third face | Without rail track | 9.36 | -4.6 | 2.13 | 2.38 |
26 | +450 up crossheading of first face | Without rail track | 4.83 | -4.2 | -0.74 | 1.92 |
27 | +820 haulage roadway | Rail track | 14.35 | 0 | 1.48 | 3.35 |
28 | +820 haulage roadway | Rail track | 14.35 | 0 | -1.48 | 2.47 |
29 | +700 belt roadway | Without rail track | 6.34 | 0 | 1.58 | 2.86 |
30 | +700 belt roadway | Without rail track | 6.34 | 0 | -1.58 | 2.73 |
31 | +570 haulage roadway | Rail track | 13.85 | 0 | 1.78 | 3.41 |
32 | +570 haulage roadway | Rail track | 13.85 | 0 | -1.78 | 2.41 |
33 | +250 bottom road of second east cross drift | Rail track | 13.11 | 0 | -0.42 | 2.94 |
34 | +250 bottom road of second east cross drift | Rail track | 13.11 | 0 | 0.42 | 3.08 |
35 | +250 haulage roadway | Rail track | 6.61 | 0 | 1.12 | 2.83 |
36 | +250 haulage roadway | Rail track | 6.61 | 0 | -1.12 | 2.67 |
37 | +450 up crossheading of first face | Without rail track | 4.83 | 4.2 | 0.74 | 2.04 |
38 | +250 up crossheading of third face | Without rail track | 9.36 | 4.6 | -2.13 | 2.60 |
39 | +450 up crossheading of fifth face | Without rail track | 9.47 | 6.4 | -0.68 | 2.57 |
40 | +450 down crossheading of fifth face | Without rail track | 7.24 | 8.6 | 0.83 | 2.54 |
41 | +250 down crossheading of third face | Without rail track | 5.95 | 11.7 | 1.83 | 2.47 |
42 | +570-+700 belt slope | Without rail track | 7.38 | 12.3 | -1.86 | 2.38 |
43 | +250-+450 belt main inclined shaft | Without rail track | 6.87 | 15.6 | 3.23 | 2.19 |
44 | +150 air shaft | Without rail track | 7.91 | 18.5 | -1.12 | 2.11 |
45 | +150-+250 auxiliary shaft slope | Without rail track | 8.13 | 19.8 | 3.46 | 2.07 |
46 | +450-+570 coal flume slope | Rail track | 1.89 | 20.3 | -1.23 | 0.76 |
47 | +250 belt roadway -+450 ventilation slope | Without rail track | 9.23 | 20.9 | 2.29 | 2.04 |
48 | +150-+250 overhead cableway | Without rail track | 14.17 | 21.5 | 2.28 | 2.01 |
49 | +570 uphill slope | Without rail track | 6.60 | 21.8 | 0.94 | 1.98 |
50 | +570 -+700 second ventilation slope | Without rail track | 9.23 | 22.2 | -1.54 | 1.95 |
51 | +450-+570 impractical person vehicle slope | Without rail track | 12.89 | 23.3 | 2.17 | 1.89 |
52 | +700-+820 ventilation slope | Without rail track | 7.81 | 24.6 | -3.25 | 1.71 |
53 | +570 -+700 first ventilation slope | Without rail track | 9.28 | 24.8 | 2.64 | 1.84 |
54 | +450 -+570 second ventilation slope | Without rail track | 8.24 | 25.2 | -1.42 | 1.78 |
55 | +150-+250 impractical person vehicle slope | Without rail track | 10.87 | 26.2 | 1.02 | 1.67 |
56 | +150-+250 ventilation slope | Without rail track | 8.77 | 26.6 | 3.39 | 1.38 |
57 | +450 drawing roadway | Rail track | 12.85 | 26.8 | 1.72 | 1.55 |
58 | +450-+570 air shaft | Without rail track | 6.96 | 27.5 | 3.16 | 1.34 |
59 | +820-+930 return air slope | Without rail track | 8.53 | 28.3 | -8.69 | 0.98 |
60 | +450-+570 first ventilation slope | Without rail track | 6.78 | 28.5 | 2.89 | 1.28 |
61 | +250 -+450 ventilation slope | Without rail track | 6.18 | 29.3 | -2.17 | 1.22 |
62 | +250-+450 auxiliary shaft slope | Without rail track | 14.35 | 27.5 | 0.82 | 1.64 |
63 | +820 fifth west cross drift | Rail track | 12.83 | 0 | 2.31 | 2.86 |
64 | +820 fifth west cross drift | Rail track | 12.83 | 0 | -2.31 | 2.79 |
65 | +820 roof road of north cross drift | Rail track | 13.14 | 0 | 2.04 | 2.82 |
66 | +820 roof road of north cross drift | Rail track | 13.14 | 0 | -2.04 | 2.76 |
67 | +570 seventh west cross drift | Rail track | 9.36 | 0 | 2.31 | 2.64 |
68 | +570 seventh west cross drift | Rail track | 9.36 | 0 | -2.31 | 2.58 |
69 | +150 down crossheading of second face | Without rail track | 7.04 | -16.1 | 1.21 | 1.85 |
70 | +150 down crossheading of second face | Without rail track | 7.04 | 16.1 | -1.21 | 2.16 |
71 | +150 up crossheading of second face | Without rail track | 9.60 | -12.3 | -1.28 | 2.02 |
72 | +150 up crossheading of second face | Without rail track | 9.60 | 12.3 | 1.28 | 2.25 |
73 | +150 east level roadway | Rail track | 13.87 | 0 | 1.12 | 2.88 |
74 | +150 east level roadway | Rail track | 13.87 | 0 | -1.12 | 2.82 |
75 | +150 mining section east roadway | Rail track | 9.83 | 0 | 1.45 | 2.64 |
76 | +150 mining section east roadway | Rail track | 9.83 | 0 | -1.45 | 2.67 |
77 | +700 second west cross drift | Rail track | 12.17 | 0 | 2.26 | 2.81 |
78 | +700 second west cross drift | Rail track | 12.17 | 0 | -2.26 | 2.73 |
79 | +450 haulage roadway | Rail track | 10.68 | 0 | 2.17 | 2.74 |
80 | +450 haulage roadway | Rail track | 10.68 | 0 | -2.17 | 2.62 |
|