Symbol | Definition |
|
| The set of task groups |
|
| The number of tasks that are included in task group |
|
| The set of gantry cranes that can be scheduled in the yard |
|
| The set of blocks |
|
| The number of tasks completed by gantry crane in block during the planned period |
|
| Task overflow of task group during the planned period |
|
| Task overflow in the block during the previous period |
|
| The maximum working capacity of each gantry crane during the planned period |
|
| The distance from block to block |
|
| The time when gantry crane moves from block to block |
|
| The time when gantry crane tires are rotated through 90 degrees once |
|
| The moving speed of gantry cranes |
|
| Average operating efficiency of gantry cranes |
|
| The set of railway loading and unloading lines |
|
| The moment when the gantry crane reaches loading and unloading line |
|
| The moment when gantry crane departs loading and unloading line |
|
| The moment when the pth container train reaches loading and unloading line |
|
| The moment when the pth container train departs loading and unloading line |
|
| A binary parameter satisfying , if block has task group ; and , otherwise |
|
| A binary parameter satisfying , if gantry crane is placed in block in the initial state; and , otherwise |
|
| A binary variable satisfying , if gantry crane handles task group during the planned period; and , otherwise |
|
| A binary variable satisfying , if gantry crane moves from block to block ; and , otherwise |
|