Research Article

Research on Prediction Method of Reasonable Cost Level of Transmission Line Project Based on PCA-LSSVM-KDE

Table 5

Cost intervals with different confidence levels.

SampleActual valuePoint prediction valueCost prediction interval
80% confidence level85% confidence level90% confidence level95% confidence level

14.344.133.604.533.564.583.504.713.414.87
24.904.443.874.873.834.933.765.063.675.23
35.015.244.575.764.525.824.445.984.346.18
45.044.654.065.114.015.173.945.313.855.49
55.085.494.786.024.736.094.656.254.546.47
65.104.594.015.043.965.103.895.243.805.42
7012.8413.5211.7914.8411.6515.0111.4515.4111.1815.94