Research Article
Research on Construction Safety Risk Assessment of New Subway Station Close-Attached Undercrossing the Existing Operating Station
Table 1
Preliminary risk factors of the new subway station close-attached undercrossing the existing station.
| First-level index | Second-level index |
| A Existing subway station | A1 Station structure | A2 Track structure | A3 Power supply system | A4 Water supply and drainage system | A5 Ventilation and signal system | B New subway station | B1 Construction monitoring of existing station | B2 New space enclosing structure | B3 Engineering dewatering | B4 Foundation pit excavation | B5 Surrounding rock and soil mass and surrounding environment | B6 Construction technology management of main structure | B7 Green construction |
|
|