Research Article

Influence of the Hydraulic Boundary Condition between the Embankment and Saturated Half-Space on the Train-Induced Ground Vibration

Figure 13

The vertical velocity under a moving train with =30 Hz: (a) in the time domain and (b) in the frequency domain (V = 250 km/h).
(a)
(b)