Research Article
Artificial Bee Colony Optimization of NOx Emission and Reheat Steam Temperature in a 1000 MW Boiler
Table 5
HV indicator and time consumption by MOEAs.
| Loads | MOEAs | r | HV | Time consuming (s) |
| 650 MW | MO-ABC | (1200, 0.002) | 0.3574 | 36.503 | NSGA-II | (1200, 0.002) | 0.2892 | 37.021 |
| 800 MW | MO-ABC | (500, 0.002) | 0.1481 | 38.105 | NSGA-II | (500, 0.002) | 0.1062 | 37.929 |
| 850 MW | MO-ABC | (500, 0.002) | 0.1239 | 30.856 | NSGA-II | (500, 0.002) | 0.0590 | 29.499 |
|
|