Mathematical Problems in Engineering / 2019 / Article / Alg 1

Research Article

Dynamic Multiobjective Software Project Scheduling Optimization Method Based on Firework Algorithm

Algorithm 1

Updating the mature firework archive.

Input: The sorted sparks set , previous mature firework archive
Output:
(1) if
(2) = the former sparks of
(3) else
(4) = Fast non-dominated sorting(US())
(5) = the former sparks of
(6)
(7)
(8) end if

We are committed to sharing findings related to COVID-19 as quickly and safely as possible. Any author submitting a COVID-19 paper should notify us at help@hindawi.com to ensure their research is fast-tracked and made available on a preprint server as soon as possible. We will be providing unlimited waivers of publication charges for accepted articles related to COVID-19. Sign up here as a reviewer to help fast-track new submissions.