Research Article
ECC Design Based on Uniform Design Test Method and Alternating Conditional Expectation
Table 7
ECC mix proportion uniform design table (mass ratios).
| No. | Cement | Fly ash | w/c | Fiber | Quartz sand | Water-reducing admixture | Remarks |
| 1 | 1.0 | 0.110 | 0.767 | 0.022 | 1.0 | 0.012 | Failure, too much water, unworkable | 2 | 1.0 | 0.431 | 1.200 | 0.008 | 1.4 | 0.001 | Failure, too much water, unworkable | 3 | 1.0 | 0.752 | 0.680 | 0.04 | 0.6 | 0.013 | Success | 4 | 1.0 | 1.073 | 1.113 | 0.036 | 1.6 | 0.001 | Success | 5 | 1.0 | 1.394 | 0.593 | 0.005 | 0.6 | 0.015 | Success | 6 | 1.0 | 1.716 | 1.027 | 0.055 | 0.7 | 0.001 | Success | 7 | 1.0 | 2.037 | 0.507 | 0.029 | 0.3 | 0.036 | Failure, insufficient water, unworkable | 8 | 1.0 | 2.358 | 0.940 | 0.00 | 1.0 | 0.016 | Success | 9 | 1.0 | 2.679 | 0.420 | 0.059 | 0.2 | 0.04 | Failure, insufficient water, unworkable | 10 | 1.0 | 3.000 | 0.853 | 0.031 | 0.4 | 0.04 | Failure, insufficient water, unworkable |
|
|