Research Article

Uncertainty Evaluation of Water Inrush in Karst Tunnels Based on Epistemic Uncertainty with Possibility Theory

Figure 12

Uncertainty connected with normalized margins characterized by possibility summarized with CPoF and CNF and by probability summarized with CDF: (a) for , (b) for , (c) for , and (d) for .
(a)
(b)
(c)
(d)