Research Article

A Novel Intelligent Method for Predicting the Penetration Rate of the Tunnel Boring Machine in Rocks

Table 3

Comparison of the predicted results with different methods.

Sample no.In situ measurement (m/h)BP-ANN [25]LS-SVMRVMRVM-PSO
The predicted results (m/h)The relative errors (%)The predicted results (m/h)The relative errors (%)The predicted results (m/h)The relative errors (%)The predicted results (m/h)The relative errors (%)

T12.22.4611.822.220.982.18−0.82.18−0.73
T22.953.136.12.78−5.722.84−3.732.93−0.68
T32.22.19−0.452.1−4.662.06−6.222.13−3.05
T42.032.3817.242.061.532.040.552.13.48
T51.751.74−0.571.781.481.71−2.461.771.37
T61.781.61−9.551.896.371.917.251.780.16
T72.392.27−5.022.04−14.72.05−14.272.36−1.31
T81.61.716.871.8012.651.7610.181.653.13
T91.581.57−0.631.7410.351.7410.251.7812.7
T101.841.71−7.071.955.841.998.221.861.08